Safety device for installation in a gas-supply system, in particular, an acetylene-supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9448565
SERIAL NO

14260691

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Relevant specifications in the field of gas supply provide for different safety devices for installation in a gas-supply system, in particular, an acetylene-supply system. To provide such a safety device, which is characterized by a compact structure and a high level of operational reliability, this invention proposes that a valve body (1) incorporates an over-pressure valve (4; 104) of a quick-action shut-off device, a control valve (3; 103) of a pressure-limiting device, and a safety valve (2; 102), whereby the safety valve (2; 102) can be fluidically connected to the over-pressure valve (4; 104) and the control valve (3; 103), and closes either when the over-pressure valve (4; 104) opens due to an inlet pressure that is above the inlet-pressure limit value or when the control valve (3; 103) opens due to an outlet pressure that is above an outlet-pressure limit value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SPECTRON GAS CONTROL SYSTEMS GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Roncka, Andreas Gernsheim, DE 2 2
van, der Klift Johan Eppstein-Vockenhausen, DE 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00