Crystalline iron phosphate doped with metal, method of preparing the same, and lithium composite metal phosphate prepared therefrom

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9190665
APP PUB NO 20140319413A1
SERIAL NO

14360338

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a crystalline iron phosphate doped with metals (MFePO4), which is used as a precursor of olivine-structured LiMFePO4 (LMFP) used as a cathode active material for lithium secondary batteries, and a method of preparing the crystalline iron phosphate, in which a crystalline iron phosphate doped with metals has the following Formula I obtained by crystallizing amorphous iron phosphate and doping the latter with a different type of a metal. Formula I: MFePO4, where M is selected from the group consisting of Ni, Co, Mn, Cr, Zr, Nb, Cu, V, Ti, Zn, Al, Ga, Mg, and B. The preparation of olivine-structured LMFP, which is used as a cathode active material for lithium secondary batteries, using the crystalline iron phosphate doped with metals as a precursor can increase efficiency and reduce processing costs as compared to another method of preparing the same by mixing different types of metals in a solid state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG SDI CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Song, Hyun A Gyeonggi-do, KR 7 8
Yang, Woo Young Daejeon, KR 37 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00