Techniques for fabricating Janus sensors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9251979
APP PUB NO 20140326047A1
SERIAL NO

14010945

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Electromechanical sensors that employ Janus micro/nano-components and techniques for the fabrication thereof are provided. In one aspect, a method of fabricating an electromechanical sensor includes the following steps. A back gate is formed on a substrate. A gate dielectric is deposited over the back gate. An intermediate layer is formed on the back gate having a micro-fluidic channel formed therein. Top electrodes are formed above the micro-fluidic channel. One or more Janus components are placed in the micro-fluidic channel, wherein each of the Janus components has a first portion having an electrically conductive material and a second portion having an electrically insulating material. The micro-fluidic channel is filled with a fluid. The electrically insulating material has a negative surface charge at a pH of the fluid and an isoelectric point at a pH less than the pH of the fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GLOBALFOUNDRIES INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cao, Qing Yorktown Heights, US 149 560
Cheng, Kangguo Schenectady, US 3065 29582
Li, Zhengwen Scarsdale, US 126 1284
Liu, Fei Yorktown Heights, US 381 2239
Zhang, Zhen Ossining, US 429 3847

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00