Earth working apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9408339
APP PUB NO 20140338938A1
SERIAL NO

14277437

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An earth working apparatus includes a working implement having a first end and a second end. The earth working apparatus also includes a first support supporting the working implement, where the first support also has a first end and a second end. The earth working apparatus further includes a first arm connecting the first end of the working implement to the first end of the first support, and a second arm connecting the second end of the working implement to the second end of the first support. A second support is pivotally coupled with the first support by a torsion coupler. The first arm and the second arm can be pivotally coupled with the first support by a torsion coupler. The second support can be connected to a third support and configured to articulate with respect to the third support between a generally horizontal working orientation and a transport orientation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAMILTON EQUIPMENT COMPANYBOBCAT OF LINCOLN 8801 HWY 6 LINCOLN NE 68507

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jensen, Layton Thurston, US 2 5
Sovereign, Dwayne W Lincoln, US 2 5
Sprague, Glen W Lincoln, US 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00