Method of treating a high-temperature well with a fluid containing a viscosifier and a stabilizer package

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9260648
APP PUB NO 20140342952A1
SERIAL NO

13895218

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A treatment fluid for treating a portion of a high-temperature subterranean formation comprises: a base fluid, wherein the base fluid comprises water; a viscosifier, wherein the viscosifier is a polymer, and wherein the viscosifier is thermally stable up to a temperature of 325° F.; and a stabilizer package, wherein the stabilizer package: (A) comprises a first stabilizer and a second stabilizer, wherein the first stabilizer is an oxygen scavenger and the second stabilizer is a pH adjustor; and (B) is capable of increasing the thermal stability of the viscosifier to a temperature greater than 350° F., wherein the portion of the subterranean formation has a bottomhole temperature greater than 350° F. A method of treating a high-temperature subterranean formation comprises introducing the treatment fluid into the portion of the subterranean formation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Danait, Achala V Pune, IN 11 44
Kalgaonkar, Rajendra A Pune, IN 12 288
Suryawanshi, Prerana U Pune, IN 4 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00