Drive control device and method for electronic expansion valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9851725
APP PUB NO 20140343735A1
SERIAL NO

14370480

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A drive control device and method for an electric expansion valve is disclosed. In the disclosure, before applying a drive pulse signal corresponding to a rotary pulse number to a motor of the electronic expansion valve, a secondary positioning is performed on a relative position between stator magnetic field of the motor and rotor magnetic field of the motor by applying a holding current of a first duration time to the motor, applying an pulse signal of an additional pulse number to the motor, and applying a holding current of a second duration time to the motor, and a same secondary positioning operation is also performed on the motor after applying the drive pulse signal corresponding to the rotary pulse number to the motor of the electronic expansion valve, which ensures that the electronic expansion valve operates according to the drive pulse signal corresponding to the rotary pulse number.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HISENSE USA CORPORATION;QINGDAO HISENSE HITACHI AIR-CONDITIONING SYSTEMS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deng, Yuping Qingdao, CN 6 5
Huang, Shuliang Qingdao, CN 8 18
Li, Xizhi Qingdao, CN 2 3
Zhang, Xianlin Qingdao, CN 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00