Seamless transition between interlaced and progressive video profiles in an ABR system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8928808
SERIAL NO

13913224

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for seamless transition between interlaced and progressive video profiles may include receiving at a video feeder a stream of video signals for displaying on a display device. The stream of video signals may include segments of one of interlaced fields or progressive video frames. During an interlaced stream, the interlaced fields may be directed to a deinterlacer, and an output of the deinterlacer may be directed to the display device. The output of the deinterlacer may be determined based on previously received interlaced fields from the video feeder. During a transition to a progressive stream, the progressive video frames may be directed to a frame store, and the output of the deinterlacer may be directed to the display device. During a progressive stream, the progressive video frames may be directed to the frame store, and previously stored frames may be directed to the display device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shin, Jaewon Mountain View, US 28 91
Wyman, Richard Hayden Sunnyvale, US 25 129

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 6, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00