Method of refurbishing an energy conversion facility and refurbished energy conversion facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10190565
APP PUB NO 20140363280A1
SERIAL NO

14280902

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This method can be used for refurbishing a facility for converting hydraulic energy into electrical or mechanical energy, and vice versa. The facility includes a Francis type pump-turbine. The pump-turbine includes a runner movable about an axis, a pre-distributor, including stay vanes defining between each pair of two adjacent stay vanes a first water passage channel and a distributor, including guide vanes arranged downstream of the stay vanes in the direction of water flow feeding the pump-turbine operating in turbine mode. The guide vanes define between each pair of two adjacent guide vanes a second water passage channel. This method includes steps of reducing the height, taken parallel to the axis of rotation of the runner, of the first water passage channels and reducing the height, taken parallel to the axis of rotation of the runner, of the second water passage channels.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GE RENEWABLE TECHNOLOGIES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Antheaume, Sylvain Grenoble, FR 1 1
Beral, Claude Veurey Voroize, FR 6 10
Houdeline, Jean-Bernard Chirens, FR 4 5
Lavigne, Sylvain Daniel Chirens, FR 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 29, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 29, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00