T-piece preformer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10400916
APP PUB NO 20140367959A1
SERIAL NO

14237118

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A T-piece preformer for forming a T-piece in a pipe-in-pipe (PIP) pipeline for a marine environment, the PIP pipeline has at least inner and outer pipes having an annular space thereinbetween, and one or more cables extending along the annular space. The T-piece preformer includes at least: (a) inner and outer longitudinal collars; (b) annular walls between the inner and outer collars; (c) cable apertures through each annular wall; and (d) one or more guide points on the outer collar radially offset from the or each cable apertures, to guidance for a hole into the T-piece performer. The T-piece preformer can be assembled into a PIP pipeline, and requires a final hole during laying. The T-piece preformer has cable apertures through each annular wall, for allowing continuation of cables in the annular space through the PIP pipeline and T-piece preformer, and the T-piece.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TECHNIP FRANCE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Delaporte, Dominique-Louis Lons, FR 2 18
Lynch, Brian Aberdeen, GB 61 1329
Popineau, Dominique Pau, FR 2 2
Romazzotti, Henri Marie Louis Robert Arbus, FR 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00