Divot-free planarization dielectric layer for replacement gate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9356121
SERIAL NO

14486128

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

After formation of a silicon nitride gate spacer and a silicon nitride liner overlying a disposable gate structure, a dielectric material layer is deposited, which includes a dielectric material that is not prone to material loss during subsequent exposure to wet or dry etch chemicals employed to remove disposable gate materials in the disposable gate structure. The dielectric material can be a spin-on dielectric material or can be a dielectric metal oxide material. The dielectric material layer and the silicon nitride liner are planarized to provide a planarized dielectric surface in which the disposable gate materials are physically exposed. Surfaces of the planarized dielectric layer is not recessed relative to surfaces of the silicon nitride layer during removal of the disposable gate materials and prior to formation of replacement gate structures, thereby preventing formation of metallic stringers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jagannathan, Hemanth Guilderland, US 258 2195
Mehta, Sanjay Niskayuna, US 86 1422

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 30, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00