Method, computer program and system providing real-time power grid hypothesis testing and contingency planning

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11093678
APP PUB NO 20150006128A1
SERIAL NO

13956452

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is disclosed to simulate operation of a grid structure. The method includes specifying a type of simulation to be performed and at least one initial condition with a user interface of a device such as a mobile device, where the grid structure comprises at least one of a power generation grid and a power distribution grid. The method further includes transmitting the specified type of simulation and the at least one initial condition from the user device to a computing platform; receiving from the computing platform a result of the simulation at the user device; and visualizing the result of the simulation with the user interface. The type of simulation can be an N-k contingency analysis simulation, where k is equal to zero, 1 or greater than 1.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINE CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Enenkel, Robert F Markham, CA 17 161
Perrone, Michael P Yorktown Heights, US 28 337

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 17, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 17, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 17, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00