Method and system of removing debris from piping in a high-rise building plumbing network

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10301804
APP PUB NO 20150013724A1
SERIAL NO

14330879

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of removing debris from piping within a high-rise building plumbing network includes inserting a portion of a flexible optical device and flexible water conduit into an opening defined by a plumbing system, the flexible water conduit operably coupled to a water pressure device. The method also includes coupling an end of a vacuum conduit, operably coupled to a vacuum assembly, to the opening and producing an image of a plumbing channel defined by the plumbing system with the flexible optical device. Next, the method includes maneuvering the portion of the flexible optical device within the plumbing system until the image of the plumbing channel depicts a debris at least partially obstructing the plumbing channel, inducing a stream of fluid directed at the debris, and then inducing a vacuum within the plumbing system sufficient to remove the debris from the plumbing system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grenier, Daniel Sarasota, US 5 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00