Early data delivery prior to error detection completion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9104564
APP PUB NO 20150019935A1
SERIAL NO

14501101

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A computer implemented method for early data delivery prior to error detection completion in a memory system includes receiving a frame of a multi-frame data block at a memory control unit interface. A controller writes the frame to a buffer control block in a memory controller nest domain. The frame is read from the buffer control block by a cache subsystem interface in a system domain prior to completion of error detection of the multi-frame data block. Error detection is performed on the frame by an error detector in the memory controller nest domain. Based on detecting an error in the frame, an intercept signal is sent from the memory controller nest domain to a correction pipeline in the system domain. The intercept signal indicates that error correction is needed prior to writing data in the frame to a cache subsystem.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gilda, Glenn D Binghamton, US 26 271
Hodges, Mark R Endicott, US 10 170
Meaney, Patrick J Poughkeepsie, US 124 1375
Papazova, Vesselina K Highland, US 36 588

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00