Control valve control method and control device, and power generating plant utilizing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9689280
APP PUB NO 20150020499A1
SERIAL NO

14333619

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas turbine plant including a gas turbine and a compressor is provided with a steam turbine plant including a steam turbine and a condenser, and, an exhaust heat recovery boiler. Steam from the exhaust heat recovery boiler is directly flown to the condenser of the steam turbine plant through a bypass control valve. A pressure sensor detects pressure in a turbine bypass system. A controller outputs, based on a set value from an input device and a process value from the pressure sensor, an open level instruction value to the control value so as to make the process value consistent with the set value in a predetermined sampling cycle. A corrector corrects the set value from the input device in a direction in which the open level instruction value decreases when the open level instruction value from the controller becomes a value that substantially fully opens the control valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Juangsa, Firman Bagja Bandung, ID 3 7
Tobo, Masayuki Kawasaki, JP 21 43
Watanabe, Hironori Yokohama, JP 33 269
Yamasaki, Takuji Kawasaki, JP 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00