Manufacturing method for electric furnace steel for carburizing without Mo addition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9580778
APP PUB NO 20150023833A1
SERIAL NO

14334801

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric furnace steel contains, by mass %, C: 0.12 to 0.28%, Si: equal to or less than 0.15%, Mn: 0.65 to 0.95%, P: equal to or less than 0.035%, S: equal to or less than 0.035%, Cr: 1.35 to 1.90%, Al: 0.020 to 0.050%, and N: 0.0080 to 0.0230%. A scrap material is selected such that Cu, Ni, and Mo that derive from the scrap material and are thus contained as impurities in the electric furnace steel satisfy Expression 1. The electric furnace steel further contains Fe and unavoidable impurities as a remainder thereof. Accordingly, the electric furnace steel can secure carburizing quality equivalent to or higher than that of Cr—Mo steel, and can have properties equivalent to or higher than that of Cr—Mo steel, without adding Mo.

description='In-line Formulae' end='lead'([Cu]+2×[Ni])0.76×[Mo]≧0.0040  Expression 1:description='In-line Formulae' end='tail'

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AICHI STEEL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adachi, Yuji Aichi, JP 25 499
Fukuda, Naoki Aichi, JP 41 610

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 28, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00