Burner for the gasification of a solid fuel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10066832
APP PUB NO 20150041718A1
SERIAL NO

13876403

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is directed to a burner for the gasification of a solid fuel, comprising a burner front having an opening for discharging a solid fuel, wherein the opening for discharging the solid fuel is fluidly connected to a central passage way and wherein the central passage way has a downstream part wherein the diameter of the passage way increases over a first length and subsequently decreases over a second length terminating at the burner front and wherein inside the downstream part of the central passage way a hollow member is positioned, and wherein the hollow member has an internal increasing diameter and inner decreasing diameter aligned with the increasing and decreasing diameter of the hollow member and wherein the connecting conduits have a discharge opening positioned in the diverging part of the hollow member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AIR PRODUCTS AND CHEMICALS, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Disselhorst, Johannes Hermanus Maria Castricum, NL 6 12
Van, Dongen Franciscus Gerardus Amsterdam, NL 15 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00