Vertical ferroelectric field effect transistor constructions, constructions comprising a pair of vertical ferroelectric field effect transistors, vertical strings of ferroelectric field effect transistors, and vertical strings of laterally opposing pairs of vertical ferroelectric field effect transistors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9337210
SERIAL NO

13964309

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vertical ferroelectric field effect transistor construction comprises an isolating core. A transition metal dichalcogenide material encircles the isolating core and has a lateral wall thickness of 1 monolayer to 7 monolayers. A ferroelectric gate dielectric material encircles the transition metal dichalcogenide material. Conductive gate material encircles the ferroelectric gate dielectric material. The transition metal dichalcogenide material extends elevationally inward and elevationally outward of the conductive gate material. A conductive contact is directly against a lateral outer sidewall of the transition metal dichalcogenide material that is a) elevationally inward of the conductive gate material, or b) elevationally outward of the conductive gate material. Additional embodiments are disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MICRON TECHNOLOGY, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Karda, Kamal M Boise, US 152 821
Mouli, Chandra Boise, US 291 3844
Sandhu, Gurtej S Bosie, US 1216 32355

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 10, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00