Control device of AC motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9431935
APP PUB NO 20150054431A1
SERIAL NO

14458489

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device of a three-phase AC motor includes: an inverter that drives the AC motor; a current sensor that senses a current flowing in a sensor phase of the AC motor as a sensor phase current; and a controller that switches on and off a switching element of the inverter to control a current flowing through the AC motor. The controller includes: a current estimation device that estimates d-axis and q-axis current estimated values based on the sensor phase current and an electric angle of the AC motor; and a zero-crossing interpolation device that interpolates a command value relating to a voltage of the AC motor when the sensor phase current is in a zero cross range, which includes a zero point. When the sensor phase current is in the zero cross range, the zero-crossing interpolation device interpolates the command value with a continuous variable value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DENSO CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Omata, Ryuji Anjo, JP 38 169
Oowada, Takahumi Kariya, JP 16 103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 29, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00