Method for producing a reinforcement member of composite material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9815226
SERIAL NO

14469999

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a reinforcement member of composite material. The method includes producing a planar preform by stacking sheets of pre-impregnated fibers, heating the preform, and deforming the preform on a mold surmounted by an upper die whose shape confirms to a central portion of the reinforcement member to be obtained. The reinforcement member wings are in contact with the mold at two opposite lateral sides of the upper die after deformation. The deformed preform is also baked. Prior to deformation of the preform, a coating is applied promoting a sliding between the preform and the mold during the deformation. The coating comprises two tear-off strips superimposed on each other. A first tear-off strip is in the form of a pre-impregnated material in contact with the preform and a second tear-off strip is in the form of a dry material superimposed on the first tear-off strip.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AIRBUS OPERATIONS SAS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Estragnat, Pierre Toulouse, FR 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00