Fuel cell start up method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10741859
APP PUB NO 20150064509A1
SERIAL NO

14389877

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel cell module is configured or operated, or both, such that after a shut down procedure a fuel cell stack is discharged and has its cathode electrodes at least partially blanketed with nitrogen during at least some periods of time. If the fuel cell module is restarted in this condition, electrochemical reactions are limited and do not quickly re-charge the fuel cell stack. To decrease start up time, air is moved into the cathode electrodes before the stack is re-charged. The air may be provided by a pump, fan or blower driven by a battery or by the flow or pressure of stored hydrogen. For example, an additional fan or an operating blower may be driven by a battery until the fuel cell stack is able to supply sufficient current to drive the operating blower for normal operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYDROGENICS CORPORATION220 ADMIRAL BLVD MISSISSAUGA L5T 2N6

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Joos, Nathaniel Ian Toronto, CA 64 345

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00