Semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8988138
APP PUB NO 20150070084A1
SERIAL NO

14202577

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device includes an input-part receiving a first voltage and an output-part outputing a second voltage. A current mirror part receives the first voltage. A reference voltage is supplied to a gate of a reference transistor. The reference transistor is electrically connected between the current-mirror part and a ground voltage. A monitor transistor includes a gate electrically connected to the second power-supply voltage, and is electrically connected between the current-mirror part and the ground voltage. A voltage-generation transistor includes a gate electrically connected to both the current-mirror part and the reference transistor. The voltage-generation transistor is electrically connected between the input-part and the output-part. A first capacitor including one end electrically connected to the output-part, and the other end electrically connected to both the current-mirror part and the reference transistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kajiyama, Yasufumi Tokyo, JP 3 2
Koyanagi, Masaru Tokyo, JP 139 847
Kumazaki, Noriyasu Kawasaki, JP 25 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 24, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00