Solid-state imaging apparatus changing a gate voltage of a transfer transistor, driving method for the same, and imaging system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9554069
APP PUB NO 20150070554A1
SERIAL NO

14472612

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid-state imaging apparatus includes: a photoelectric conversion unit configured to convert light into an electric charge; a floating diffusion region configured to convert the electric charge into a voltage; a transfer transistor configured to transfer the electric charge from the photoelectric conversion unit to the floating diffusion region; and a transfer transistor driving circuit configured to control a gate potential of the transfer transistor, wherein the transfer transistor driving circuit controls the gate potential so as to be changed in at least two changing rates during a period of transition from the ON state to the OFF state of the transfer transistor, and the second changing rate out of the two changing rates is higher than the first changing rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CANON KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujimura, Masaru Yokohama, JP 41 1024
Ohtani, Akira Ebina, JP 29 407
Shimizu, Shinichiro Yokohama, JP 22 252

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 24, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00