Traffic impact prediction for multiple event planning

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9047767
APP PUB NO 20150073688A1
SERIAL NO

14020987

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments relate to traffic impact prediction in a transportation network. Link level background traffic demand in a transportation network may be estimated based on information about available routes, and based on expected background traffic volumes between origins and destinations. A background traffic flow model that optimizes a background flow of the expected background traffic volumes among the available routes to minimize a sum of background congestion costs, background path entropy, and errors between an observed background traffic flow and the optimized background flow may be applied. Alternative routes may be identified based on the available routes and event based control plans. Expected additional event based traffic volumes may be received. A link level total traffic demand in the transportation network may be estimated based on the expected additional event based traffic volumes, the identified alternative routes, and the estimated background traffic demand.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GLOBALFOUNDRIES INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hampapur, Arun Norwalk, US 236 6136
He, Qing East Amherst, US 149 2757
Liu, Xuan Yorktown Heights, US 191 1756
Xing, Songhua Staten Island, US 13 62

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00