Methods and systems for supplying hydrogen to a hydrocatalytic reaction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9644151
APP PUB NO 20150080621A1
SERIAL NO

14485957

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bottom fraction of a product of a hydrocatalytic reaction is gasified to generate hydrogen for use in further hydrocatalytic reactions. In one embodiment, one or more volatile organic compounds is also vaporized using heat generated in the gasification process. In one embodiment, an overhead fraction of the hydrocatalytic reaction is further processed to generate higher molecular weight compounds. In another embodiment, a product of the further processing is separated into a bottom fraction and an overhead fraction, where the bottom fraction is also gasified to generate hydrogen for use in further hydrocatalytic reactions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHELL OIL COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boon, Andries Quinn Amsterdam, NL 1 3
Caputo, Franklin Eugene Amsterdam, NL 2 5
Flowers, Thomas Lamar Houston, US 6 102
Gilchrest, Molly Houston, US 4 7
Joffrion, Lamar Lane Houston, US 9 22
Johnson, Kimberly Ann Lumberton, US 31 329
Peltier, Todd Paul Richmond, US 3 5
Powell, Joseph Broun Houstonm, US 149 1397
Schenck, Hubert Willem Amsterdam, NL 5 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00