Database insert with deferred materialization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9396218
APP PUB NO 20150081616A1
SERIAL NO

14027346

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment of the present invention, a system inserts data into a database object. The system associates the database object with a parameter specifying materialization of data for the database object. The system inserts data into the database object and materializes the data in accordance with the parameter to provide access to the data from the database object, wherein the parameter specifies a portion of the data to be materialized upon insertion. Embodiments of the present invention further include a method and computer program product for inserting data into a database object in substantially the same manners described above.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALIBABA GROUP HOLDING LIMITEDFOURTH FLOOR ONE CAPITAL PLACE PO BOX 847 GRAND CAYMAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kozin, Daniel Santa Clara, US 8 45
Lin, Meichi M San Jose, US 4 6
Marais, Arthur Montgomery, US 13 114
Slinger, Nigel G Los Gatos, US 33 338
Tobler, John B San Jose, US 17 142
Zhu, Wen J Beijing, CH 3 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00