System and method for all electrical operation of a mining haul truck

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10286787
APP PUB NO 20150090554A1
SERIAL NO

14038995

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mining haul truck driven by electrical wheel motors is operated with all electrical power sources; that is, without a diesel engine. While travelling on the loading site, the mining haul truck is powered by an on-board energy storage system, which can comprise a bank of ultracapacitors. The mining haul truck then moves to the bottom of a trolley ramp and is coupled to trolley lines. While travelling uphill, the mining haul truck is powered by the trolley lines, and the on-board energy storage system is charged by the trolley lines. When the mining haul truck reaches the top of the trolley ramp, the mining haul truck is uncoupled from the trolley lines. While travelling on the unloading site, the mining haul truck is powered by the on-board energy storage system. The on-board energy storage system can also be charged by retard energy generated by the wheel motors during braking.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SIEMENS INDUSTRY, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mazumdar, Joy Norcross, US 16 352

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00