Acceleration prediction in hybrid systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9104505
APP PUB NO 20150100971A1
SERIAL NO

14045292

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Predicting acceleration in a hybrid system may comprise determining a number of cross system calls in a first host-accelerator computer architecture running a workload. Host machine overhead and accelerator overhead in the first host-accelerator computer architecture associated with each of the cross system calls may be determined. Communication delay associated with each of the cross system calls in the first host-accelerator computer architecture running a workload may be determined. An application response time may be predicted for a candidate application to be run in a second host-accelerator computer architecture, based at least on the determined host machine overhead, the accelerator overhead, and the communication delay associated with each of the cross system calls in the first host-accelerator computer architecture running a workload.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dube, Parijat Hicksville, US 88 858
Meng, Xiaoqiao Yorktown Heights, US 52 950
Zhang, Li Yorktown Heights, US 2427 31906

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00