Cavities containing multi-wiring structures and devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10015881
SERIAL NO

14573461

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is disclosed for making an interconnection component. The steps include forming a mask layer covering a first opening in a sheet-like element that has first and second opposed surfaces; forming a plurality of mask openings in the mask layer, wherein the first opening and a portion of the first surface are partly aligned with each mask opening; and forming electrical conductors on spaced apart portions of the first surface and on spaced apart portions of the interior surface within the first opening which are exposed by the mask openings. The element may consist essentially of a material having a coefficient of thermal expansion of less than 10 parts per million per degree Celsius. Each conductor may extend along an axial direction of the first opening and the first conductors may be fully separated from one another within the first opening.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INVENSAS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haba, Belgacem Saratoga, US 718 20815
Mitchell, Craig San Jose, US 115 3355
Mohammed, Ilyas Santa Clara, US 305 7578
Uzoh, Cyprian Emeka San Jose, US 330 9256

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 3, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 3, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00