Image processing device, projector, and method of controlling projector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9426436
APP PUB NO 20150103257A1
SERIAL NO

14381421

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An image processing device used for a projector displays an image by projecting the image on a projection surface. A detection image generation section adapted to generate a detection image, which is an image adapted to detect a state of a projection image displayed on the projection surface, and includes a plurality of detection image parts is provided. Each of the detection image parts includes a plurality of regions having respective luminance values different from each other. The detection image generation section changes the luminance distribution of each of the detection image parts of the detection image to be generated so that the maximum luminance values of the detection image parts included in the taken detection image obtained by taking the detection image projected on the projection surface fall within an allowable range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEIKO EPSON CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakashin, Yoshitaka Matsumoto, JP 15 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00