Polarization conversion element, projector, and method for manufacturing polarization conversion element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9618834
APP PUB NO 20150103319A1
SERIAL NO

14511744

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polarization conversion element includes first light transmissive substrates and second light transmissive substrates each of which has a light incident surface and a light exiting surface and which are disposed alternately, polarization separation films, reflection films, and retardation plates. One of each of the polarization separation films and a plasma polymerization film is formed on a first surface of each of the first light transmissive substrate. Each of the reflection films is formed on a second surface of each of the first light transmissive substrate. An adhesive layer is formed on a first surface of each of the second light transmissive substrates. The other of each of the polarization separation films and the plasma polymerization films is formed on a second surface of each of the corresponding second light transmissive substrates.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEIKO EPSON CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwabuchi, Jun Matsumoto, JP 4 25
Iwamoto, Masaki Matsumoto, JP 19 207
Miyabara, Mitsuru Matsumoto, JP 6 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 11, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00