Multi-chip initialization using a parallel firmware boot process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9229730
APP PUB NO 20150106613A1
SERIAL NO

14573595

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Mechanisms, in a multi-chip data processing system, for performing a boot process for booting each of a plurality of processor chips of the multi-chip data processing system are provided. With these mechanisms, a multi-chip agnostic isolated boot phase operation is performed, in parallel, to perform an initial boot of each of the plurality of processor chips as if each of the processor chips were an only processor chip in the multi-chip data processing system. A multi-chip aware isolated boot phase operation of each of the processor chips is performed in parallel, where each of the processor chips has its own separately configured address space. In addition, a unified configuration phase operation is performed to select a master processor chip from the plurality of processor chips and configure other processor chips in the plurality of processor chips to operate as slave processor chips that are controlled by the master processor chip.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amann, Eberhard Rottenburg, DE 6 52
Haverkamp, Frank Tuebingen, DE 20 147
Huth, Thomas Boeblingen, DE 5 48
Kunigk, Jan Nufringen, DE 10 118

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00