Boom driving apparatus for construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9587656
APP PUB NO 20150107234A1
SERIAL NO

14399062

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is an apparatus for driving a boom of a construction machine, allowing required power to be reduced. The apparatus includes a boom cylinder, a variable-displacement hydraulic pump , a control valve guiding hydraulic oil discharged by the hydraulic pump to the boom cylinder, a boom-raising-operation detector boom-cylinder pressure detectors, a supply selector valve switchable between a permitting position for permitting the hydraulic oil to be supplied from the hydraulic pump a head-side chamber of the boom cylinder and a blocking position for blocking the supply, a supply oil passage permitting hydraulic oil to be supplied to the head-side chamber during the blocking, and a controller which brings the supply selector valve into the blocking position and reduces volume of the hydraulic pump upon judging that excavation reaction force extends the boom cylinder even with no supply of hydraulic oil from the hydraulic pump to the head-side chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOBELCO CONSTRUCTION MACHINERY CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tajima, Kazuharu Hiroshima, JP 7 53
Ueda, Koji Hiroshima, JP 174 1361

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 7, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00