Flexible polyurethane and polyurethane/polyorganosiloxane foam materials that absorb impact energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10138373
APP PUB NO 20150128335A1
SERIAL NO

14477521

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polyurethane foam, a polyurethane/polyorganosiloxane foam, and a polyurethane foam polyurethane/polyorganosiloxane foam material are disclosed and described herein. The materials are formed in the presence of a polymerization reaction initiator (an isoprenoid compound), and a polymerization reaction accelerator. The polyurethane foam is formed from an isocyanate and a polyol. The polyurethane foam polyurethane/polyorganosiloxane foam material comprises the polyurethane foam which is cross-linked to the polyurethane backbone to a polyurethane/polyorganosiloxane foam. Optional gelling agents, emulsification control agents, reinforcement fillers, cross-linkers, reinforcement polymers, rubber reinforcers, silk proteins, emollients, stabilizers and colorants are also described. The polyurethane and polyurethane-polyorganosiloxane foam materials exhibit a high degree of flexibility, resilience and excellent impact absorption.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • VIRFEX, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dehni, Ghassan Marion, US 5 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 27, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 27, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00