Method for producing glass particulate deposit and method for producing glass preform

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9676657
APP PUB NO 20150128650A1
SERIAL NO

14537004

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A production method for a glass particulate deposit which includes a deposition step in which, at least two liquid source material ejecting ports 31a for a glass source material 23 jetting out from a burner 22 are provided per one burner 22, the area of at least one liquid source material port 31a is 2.25×10−4 or less of the area of the flame forming part of the burner 22, the glass source material 23 is, in the form of a liquid thereof, supplied to each liquid material source port 31a, jetting gas ports 31b are arranged in such a manner that the inner periphery of the jetting gas port is positioned outside by 1.0 mm or less from the outer periphery of each liquid source material port 31a, and a gas is jetted out from each gas jetting port 31b.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUMITOMO ELECTRIC INDUSTRIES, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishihara, Tomohiro Yokohama, JP 74 728
Yamazaki, Takashi Yokohama, JP 268 2153

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00