Processes for uniform metal semiconductor alloy formation for front side contact metallization and photovoltaic device formed therefrom

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9608134
SERIAL NO

14609029

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a photovoltaic device is provided that includes a p-n junction with a p-type semiconductor portion and an n-type semiconductor portion, wherein an upper exposed surface of one of the semiconductor portions represents a front side surface of the semiconductor substrate. Patterned antireflective coating layers are formed on the front side surface of the semiconductor surface to provide a grid pattern including a busbar region and finger region. A mask having a shape that mimics each patterned antireflective coating layer is provided atop each patterned antireflective coating layer. A metal layer is electrodeposited on the busbar region and the finger regions. After removing the mask, an anneal is performed that reacts metal atoms from the metal layer react with semiconductor atoms from the busbar region and the finger regions forming a metal semiconductor alloy.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fisher, Kathryn C Tempe, US 14 55
Huang, Qiang Sleepy Hollow, US 240 2533
Papa, Rao Satyavolu S Poughkeepsie, US 54 592
Rath, David L Stormville, US 81 953

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 28, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00