Running gear frame for a rail vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9919719
APP PUB NO 20150144025A1
SERIAL NO

14403745

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A running gear frame for a rail vehicle, comprising a frame body. The frame body comprises two longitudinal beams and a transverse beam unit providing a structural connection between the longitudinal beams, such that a substantially H-shaped configuration is formed. Each longitudinal beam has a free end section forming a primary suspension interface. Each longitudinal beam has a pivot interface section associated to the free end section and forming a pivot interface for a pivot arm. Each longitudinal beam has an angled section associated to the free end section, the angled section being arranged such that the free end section forms a pillar section. The pivot interface section is integrated into to the angled section and the frame body is formed as a monolithically cast component made of a grey cast iron material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOMBARDIER TRANSPORTATION GMBHSCHONEBERGER UFER 1 BERLIN 10785

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zanutti, Cedric Sart-Eustache, BE 4 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00