Post-treating a hardened metal formed part

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10260118
APP PUB NO 20150159234A1
SERIAL NO

14559241

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A formed and hardened component made from a metallic material is post-treated by a device for electric resistance heating that has at least one first pair of contact pieces and at least one second pair of contact pieces; contacting a first partial region of the component with the contact pieces of the first pair such that the first partial region is arranged between the contact pieces of the first pair; contacting the second partial region of the component with the contact pieces of the second pair such that the second partial region is arranged between the contact pieces of the second pair; heating of the first partial region of the component to a first temperature by conducting electric current through the component by the first pair of contact pieces; setting the second partial region of the component to a second temperature by the second pair of contact pieces, which is set independently of the first temperature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MUHR UND BENDER KG57439 ATTENDORN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goddeke, Benedikt Schmallenberg, DE 1 1
Hahn, Christoph Attendorn, DE 20 163
Steffens, Hubertus Drolshagen, DE 11 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00