Method for iron-making with full oxygen and hydrogen-rich gas and equipment thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9581387
APP PUB NO 20150159952A1
SERIAL NO

14622105

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of ironmaking using full-oxygen hydrogen-rich gas which includes hot transferring and hot charging the high-temperature coke, sinter and pellet into the ironmaking furnace through transferring and charging device, and injecting oxygen and hydrogen-rich combustible gas at a predetermined temperature into the ironmaking furnace through the oxygen tuyere and the gas tuyere disposed at the ironmaking furnace, respectively. It also provides an apparatus for ironmaking using full-oxygen hydrogen-rich gas which includes a raw material system, a furnace roof gas system, a coke oven gas injecting system, a dust injecting system, a slag dry-granulation and residual heat recovering system and an oxygen system. Additionally an apparatus and method for hot transferring and hot charging of ironmaking raw material is disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CENTRAL IRON & STEEL RESEARCH INSTITUTEBEIJING 100081

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guo, Peimin Haidian District Beijing, CN 2 1
Qi, Yuanhong Haidian District Beijing, CN 2 1
Wang, Qingtao Shandong, CN 7 2
Yan, Dingliu Haidian District Beijing, CN 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00