Periodic Survey Scheduling Method and System for Safety Inspector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20150170308A1
SERIAL NO

14414441

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The management levels of inspections for LP gas supply facility and consumption facility, and data for the periodic replacement of parts is not the same (for example, the management units are consumption units, facility units, and parts units, and when re-inspecting consumption facility the management units vary, including survey units). Therefore, collective management of deadlines is not possible. In the present safety management system, a request for the deadline expiration data of an LP gas safety task is received, consumption safety data and supply facility safety data, the legal term of which will expire within a fixed period, are acquired and this data is gathered and noted in ascending order according to the legal term expiration date of the LP gas safety task, after which deadline expiration data is generated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON GAS CO LTD2-10-7 HATCHOBORI CHUO-KU TOKYO 1048540

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dekamo, Shingo Tokyo, JP 30 68
Wada, Shinji Tokyo, JP 77 701

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation