Growing buffer layers in bulk finFET structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9159811
APP PUB NO 20150171193A1
SERIAL NO

14109989

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor structure may be formed by forming a fin on a substrate, forming a gate over a portion of the fin, removing a portion of the fin not below the gate to expose a sidewall of the fin beneath the gate and a top surface of the substrate, forming a first protective layer on the top surface of the substrate but not on the sidewall of the fin, forming a second protective layer on the sidewall of the fin prevented from forming on the top surface of the substrate by the first protective layer, removing the first protective layer to expose the top surface of the substrate, forming a buffer layer on the top surface of the substrate; the buffer layer prevented from forming on the sidewall of the fin by the second protective layer, and forming a source-drain region on the buffer layer electrically connected to the fin.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Kangguo Schenectady, US 3073 29791
Khakifirooz, Ali Mountain View, US 842 11906
Reznicek, Alexander Troy, US 1408 11211
Surisetty, Charan V Clifton Park, US 39 241

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00