Apparatuses and methods for over-current protection of DC-DC voltage converters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9712041
APP PUB NO 20150171737A1
SERIAL NO

14109743

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A peak current protection circuit includes a current sensing circuit configured to sense an operating current of a DC-DC converter, and an over-current detector operably coupled with the current sensing circuit. The over-current detector is configured to generate an over-current detect signal at a peak current limit that is that is independent of a voltage level of an output signal of the DC-DC converter. A method for providing over-current protection for a DC-DC converter includes sensing an operating current of a DC-DC converter at a first input of a comparator, sensing a reference current at a second input of the comparator, comparing the first input with the second input, and generating an over-current detect signal in response to the comparison such that a peak current limit for the DC-DC converter is independent of a voltage level of an output signal of the DC-DC converter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEGRATED DEVICE TECHNOLOGY, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pagano, Rosario Chandler, US 10 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00