Shaft furnace and method of operating same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9797023
SERIAL NO

14282585

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of operating a shaft furnace includes inserting a mixture including anthracite coal and coke into a cavity defined by the furnace, and disposing a metal feedstock within the cavity. The method includes injecting natural gas at a natural gas flow rate and a first quantity of oxygen gas at a first oxygen gas flow rate into the cavity simultaneously through at least one burner. The method also includes driving a second quantity of oxygen gas at a supersonic oxygen gas flow rate into the cavity through at least one lance, wherein the supersonic oxygen gas flow rate is greater than the first oxygen gas flow rate. The method also includes combusting the mixture within the cavity to produce a stack gas, melting the metal feedstock to produce a melted metal material, and monitoring the stack gas to thereby operate the shaft furnace. A shaft furnace is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GREDE LLC4000 TOWN CENTER SUITE 500 SOUTHFIELD MI 48075

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Connors, Bill Reedsburg, US 1 8
Witters, Kipp Reedsburg, US 1 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 24, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 24, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00