Uninterruptible power supply apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9673625
APP PUB NO 20150180233A1
SERIAL NO

14642675

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An uninterruptible power supply apparatus includes a power supply unit converting AC power to generate a DC voltage to be supplied to a loading device. The uninterruptible power supply apparatus further includes a first battery unit connected to the power supply unit to receive a DC current therefrom, and stores first DC power generated from the DC voltage. The first battery unit generates a DC voltage to be supplied to the loading device from the first DC power. The uninterruptible power supply apparatus includes a second battery unit connected in parallel to the power supply unit and stores second DC power, and generates, from the second DC power stored in the second battery unit, a DC voltage to be supplied to the loading device. The uninterruptible power supply apparatus further includes a controller for controlling operation of the power supply unit, the first battery unit and the second battery unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUJI ELECTRIC CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kadoi, Hirokazu Ami-machi, JP 4 56
Kawaguchi, Koji Matsumoto, JP 93 864
Mino, Kazuaki Hino, JP 23 166
Shimizu, Ryuji Kawasaki, JP 16 100
Yamada, Ryuji Hachioji, JP 112 554

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00