Power converter, electric rolling stock and method for controlling sequence test

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9716442
SERIAL NO

14413607

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion unit performs an AC mode or DC mode conversion operation in which AC or DC power is converted to power driving a motor in order to supply a load. In response to the output of a sequence test signal instructing execution of a sequence test, a power source output switching switch shuts off the supply of a power from a power source to the power conversion unit. When the sequence test signal has been output and the supply of power to the power conversion unit has been shut off by means of the power source output switching switch, a control unit controls the AC mode or DC mode in order to cause the power conversion unit to execute a conversion operation corresponding to the power supplied to the power conversion unit in accordance with the switching history of sequence test signal output and non-output.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI ELECTRIC CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nishikawa, Katsuya Chiyoda-ku, JP 6 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00