Receiver with pipelined tap coefficients and shift control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9294313
APP PUB NO 20150195108A1
SERIAL NO

14146920

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A serializer-deserializer using series-coupled signal processing blocks to process digitized input symbols, each block having a coefficient input. Each of plurality of series-coupled coefficient delay elements has a control input and a coefficient output coupling to the coefficient inputs of a corresponding one of the signal processing modules, is controlled by a shift register having an input and a plurality of outputs, each one of the plurality of outputs coupled to the control input of a corresponding one of the coefficient delay elements. An adaptation unit has a flag output coupled to the input of the shift register, and a first coefficient output coupled to the input of a first one of the coefficient delay elements. The adaptation unit generates a flag when the adaptation unit generates a coefficient, and the coefficient is entered into the first one of the coefficient delay elements when the shift register receives the flag.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Annampedu, Viswanath Schnecksville, US 52 1374
Malipatil, Amaresh V San Jose, US 21 234
Prokop, Tomasz Pleasanton, US 12 148
Shvydun, Volodmyr Los Altos, US 1 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00