Hydraulic drive system and method for driving a belt conveyor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9463933
APP PUB NO 20150197398A1
SERIAL NO

14669652

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a hydraulic drive system for a belt conveyor with a motor-driven primary pump which is arranged in a hydraulic primary circuit and is intended for conveying hydraulic fluid, a hydraulic motor which is supplied with hydraulic fluid via the primary circuit and is intended for driving the belt conveyor, and a control device which influences the flow of hydraulic fluid in the primary circuit and is intended for controlling the belt speed of the belt conveyor. In exemplary embodiments, the primary pump is a variable displacement pump and has a pump regulator for regulating the conveyed flow of hydraulic fluid, and the control device comprises a hydraulic control circuit, which is operated by means of an auxiliary pump, for subjecting the pump regulator to an adjustable actuating pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PUTZMEISTER ENGINEERING GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Diebold, Martin Reutlingen, DE 4 8
Münzenmaier, Werner Nürtingen, DE 4 7
Mayer, Martin Reutlingen, DE 108 700

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 11, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00