Method and system for directing control lines along a travel joint

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9976361
SERIAL NO

14355113

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system for installing one or more control lines on a travel joint is disclosed. A control line coil is arranged along a travel joint. An inner mandrel is coupled to an upper bushing and a lower bushing. The control line coil is wrapped along the outer surface of the inner mandrel. The control line coil comprises a first portion located proximate the upper bushing, a second portion located proximate to the lower bushing and a straight length control line extending between the first portion and the second portion. The first distal end of the straight length control line is coupled to the upper bushing and the second distal end of the straight length control line is coupled to the lower bushing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eiman, Tyson Frisco, US 1 1
Richards, William M Flower Mound, US 24 741
Thomas, Phillip T The Colony, US 7 462

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00