Indirect heat drying method for particulate matter, refined-coal production method, indirect heat drying device, and refined-coal production device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9670431
APP PUB NO 20150218476A1
SERIAL NO

14423858

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The purpose of the present invention is to provide an indirect heat drying method and a refined-coal production method, with which the stability of carrier-gas pressure balance can be improved when using indirect heat dryers to dry particulate matter. This indirect heat drying method for particulate matter uses two indirect heat dryers, and is provided with: a step (A) in which particulate matter is dried in a first indirect heat dryer; and a step (B) in which the particulate matter is further dried in a second indirect heat dryer to obtain dried particulate matter. The indirect heat drying method for particulate matter is characterized by being further provided with a step (C) in which first microparticles included in a carrier gas discharged from the first indirect heat dryer are recovered and mixed with the particulate matter supplied to step (B); and a step (D) in which second microparticles included in a carrier gas discharged from the second indirect heat dryer are recovered and mixed with the dried particulate matter obtained in step (B).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL, LTD.);KOBE STEEL, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Katsushima, Shinichi Takasago, JP 4 36
Kinoshita, Shigeru Takasago, JP 94 370
Takahashi, Yoichi Takasago, JP 79 473
Watanabe, Hiroki Kobe, JP 139 906

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00