Metal semiconductor alloy contact resistance improvement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9449827
APP PUB NO 20150221740A1
SERIAL NO

14172526

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Contact openings are formed into a dielectric material exposing a surface portion of a semiconductor substrate. A first transition metal liner including at least one first transition metal element, a second transition metal liner including at least one second transition metal element that is different from the at least one first transition metal element and a metal contact are sequentially formed within each contact opening. Following a planarization process, the structure is annealed forming metal semiconductor alloy contacts at the bottom of each contact opening. Each metal semiconductor alloy contact that is formed includes the at least one first transition metal element, the at least one second transition metal element and a semiconductor element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alptekin, Emre Wappingers Falls, US 91 968
Breil, Nicolas L Wappingers Falls, US 32 137
Lavoie, Christian Pleasantville, US 212 3400
Ozcan, Ahmet S Pleasantville, US 94 784
Schonenberg, Kathryn T Wappingers Falls, US 56 561

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00