Drive unit of synchronous motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9948223
SERIAL NO

14420948

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is drive unit of a synchronous motor capable of improving the accuracy of magnetic flux operations with a simple configuration. To this end, the drive unit has a magnetic flux operation part which, in the case where a direction of a magnetic field pole of the synchronous motor is regarded as a d-axis and a direction orthogonal to the d-axis is regarded as a q-axis, calculates a magnetic flux of the d-axis and a magnetic flux of the q-axis on the basis of a current of the d-axis, a current of the q-axis, and a field current of the synchronous motor; and a magnetic flux operation error correcting part which calculates a phase difference between an input voltage and an input current of the synchronous motor and corrects an inner-phase difference angle calculated from the magnetic flux of the d-axis and the magnetic flux of the q-axis on the basis of the phase difference.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishida, Takashi Tokyo, JP 334 3351

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 17, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 17, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00